Production inputs
pcs/shot
Enter a whole number of cavities (1 or more).
Number of molded parts produced during one injection cycle.
s
Enter a cycle time greater than 0 seconds.
g/shot
Enter a shot weight greater than 0 grams.
Total material weight used by one injection cycle, including all cavities and runner/sprue material when applicable.
h
Enter a production time greater than 0 hours.
Live result
Material consumption
1.20
kg
Estimated for 1 hour of continuous production.
Estimated shots
120
Estimated parts
120
Cycle rate
120 shots/h
Part rate
120 parts/h
Material rate
1.20 kg/h
Shot weight is treated as the total material used by one complete injection cycle.
Formula & detailed calculation
See how cycle time, cavities, shot weight, and production time determine the result.
Production rate
\[N_{shots/h}=\frac{3600}{t_{cycle}}\]
\[N_{parts/h}=N_{shots/h}\times n_{cavities}\]
Material consumption rate
\[\dot{m}=\frac{N_{shots/h}\times m_{shot}}{1000}\]
Shot weight is entered in grams per injection cycle; dividing by 1000 converts grams to kilograms.
Selected production period
\[m_{total}=\dot{m}\times t_{production}\]
Current calculation
Important: cavity count changes the number of parts produced, but it does not change kg/shot when the entered shot weight already represents the complete injection shot. If you only know individual part weight, first calculate the total shot weight for all cavities and add runner/sprue weight when applicable.